Feeder Road to the A421 - Bedfordshire
Leca® LWA selected for award winning embankment design
Leca® LWA is a key constituent in a unique embankment constructed using discarded tyres that has won the prestigious Fleming Award for excellence for the Balfour Beatty/Scott Wilson (now URS Scott Wilson) geotechnical team.
Leca® LWA has been used for regulating layers between the layers of tyre bales and also for the shallow sections of the embankment where tyre bales could not be used. The embankment carries a realigned side road to the A421 in Bedfordshire. This is the first time that tyre bales have been used to form an embankment on a public road in the UK. They have been used previously for subgrade improvement and flood defence bunds. Tyre bales are formed by lacing together about 100 used tyres which are then compressed and tied with wire. Simply placed into position, the spaces between the tyres are then filled with Leca® LWA by mechanical shovel which also tracks across the material to ensure optimum compaction.
Leca® LWA is a totally natural product. It is lightweight expanded clay formed by heating and firing natural glacial clay in a rotary kiln at temperatures up to 1150°C. This process transforms the clay into lightweight ceramic granules with a hard ceramic shell and porous core. The material is extremely light with a dry bulk density of just 0.3 tonnes per cubic metre. Leca® LWA has excellent insulation properties, is free draining, fire resistant, frost resistant and chemically inert with no hazardous properties. Used as a lightweight aggregate fill in many civil engineering applications Leca® LWA reduces the weight on weak substrates and against retaining structures can reduce the weight-loading by 75% over traditional fill. Leca® LWA eliminates expensive settlement delays, is easily handled and quickly installed. Leca® LWA is delivered to site in bulk in walking-floor trailers that remove the risk of unstable tippers on uneven surfaces.
The Highways Agency awarded the Early Contractor Involvement contract to the A421 improvement scheme in Bedford to Balfour Beatty Major Civil Engineering and their designer URS/Scott Wilson in November 2005. Further cost analysis of the initial design indicated that tyre bales would provide a substantial cost saving and approximately 350,000 tyres were used in the four layers of bales used within the embankment. Over 11,000m³ of Leca® LWA was required to complete this technically advanced, award-winning geotechnical design.
Phil Clifton, Balfour Beatty’s project director, emphasises the sustainability of the used tyre application: “Road building can offer a substantial capacity for the inclusion of used tyres, removing them from incineration or shredding, which are both expensive disposal methods. Coupled with the drainage and stability attributes of Leca® LWA this is now a proven and recognised construction application. We are very proud to have won the Fleming Award, instituted by Cementation Skanska, which recognises our excellence in design and construction innovation.”